📢 Changes to Pedestrian Traffic in the Plant
As part of the urgent integration of the Privas production lines (THOT project), the plant must rapidly increase its production space.
🔎 Options considered
Several solutions were explored:
- Expanding the usable production area
- Modifying patios to create a new corridor
➜ requires waterproofing and structural work - Routing pedestrian traffic outside the building
➜ requires resurfacing and upgrading walkways - Reworking the existing ESD corridor along the south wall
✅ Selected solution
During the May 21 Works Council (CSE), management presented its analysis of pedestrian traffic:
- Around 900 daily movements (both directions combined)
- Mainly for access to the cafeteria, restaurant, parcel room, etc.
👉 The chosen option is:
Reworking the existing corridor along the south wall
(new walkway highlighted in blue on the plan)
Why this choice?
Other options were rejected due to:
- High costs
- Long implementation timelines
- Regulatory constraints (Local Urban Plan)
⚠️ Guidelines to follow
Management asks everyone to:
- Keep noise to a minimum while moving through the area
- Avoid stopping in these workspaces
💬 You are also encouraged to share your feedback and suggestions via the dedicated form.
❗ CFE-CGC representatives’ position
This solution does not convince your representatives.
While the urgency is understood, the impact on working conditions is significant:
- 900 daily crossings through areas now functioning as passageways
- Increased disturbance for employees working in open spaces
👉 The topic will be reviewed again by the Works Council by October. We kindly invite you to contact us in case the situation worsens.